The technology of freeze dryer produced by Shanghai Haozhuang Instrument Co., Ltd. is leading

Shanghai Haozhuang Instrument Co., Ltd. has developed the LNB brand freeze dryer, which is energy-saving, environmentally friendly and domestically leading. Shanghai Haozhuang Instrument Co., Ltd. Haozhuang has a recognized team of experts in the industry and first-class scientific and technological talents. With a deep understanding and mastery of scientific instrument technology, it operates a variety of freeze dryers and provides you with perfect pre-sales and sales. And after-sales service, professional provision of technical consulting and other services, Shanghai Haozhuang looks forward to your consulting purchase!

Shanghai Haozhuang teaches you how to operate the freeze dryer correctly, as follows:
Boot operation:
1. Turn on the power cord, and then check whether the main power indicator is flashing. The flashing indicates that the power is on.
2. Press the "Total Power" switch for three seconds, at this time the "Cold Trap Temperature" display window starts to display the cold trap temperature, and release this key.
3. Press the “Refrigerator” key, the refrigerator starts to run, and the temperature of the cold trap gradually decreases. In order to allow the cold trap to fully absorb water, the pre-cooling time should be no less than 30 minutes.
4. Press the "Vacuum Gauge" key, the vacuum digital display is "110" and the "103" indicator lights.
5. After the pre-cooling, place the prepared items in the drying tray, cover the plexiglass tube, and tighten the inflation valve and the drain valve (located on the right panel) clockwise.
6. Press the "vacuum pump" key, the vacuum pump starts to work, the digital display drops below 20Pa, and the freeze-drying process begins. Note: When the vacuum pump starts to work, press down the plexiglass cover for a while to facilitate sealing.
7. For the multi-manifold type, the rubber valve should be closed first (the spool length should be upward), and when the vacuum reaches 20Pa or less, insert the pre-frozen bottle into the lower port of the rubber valve and rotate the plastic spool downward by 180 degree. Note: At this time, the indication of the vacuum gauge will rise. When the vacuum reaches 20Pa or less, refill the next bottle.
Shutdown operation:
1. First, slowly (must be slow, otherwise the oil in the vacuum pump will suck back), open the "inflation valve", and press the power switch of the "vacuum pump" at the same time, so that the air slowly enters the cold trap. If you need to fill with inert gas, connect the decompression pipe of inert gas to the "inflation port", and then slowly open the "inflation valve", so that the inert gas slowly enters the cold trap.
2. Press the "Vacuum Meter" and "Refrigerator" switches in turn to turn off. At this time, the indicator light is off, and the "total power supply" key is turned on. When the power is turned on for three seconds, there is no display and then release this key.
3. Lift the plexiglass cover, take out the items, store them, and the freeze-drying process ends.
4. After the ice in the cold trap turns into water, open the "drain valve" to drain the water.
5. Clean up the water and impurities in the cold trap, and maintain the equipment properly.
6. When the vacuum pump is not in use, cover the spout to prevent dirt from entering. 7. For the manifold type, close the rubber valves one by one and remove the lyophilized bottles and then repeat the shutdown operation.
Note: Do not switch frequently during the operation. If the refrigerator is stopped due to an operation error, it cannot be started immediately. Wait at least 20 minutes before restarting to avoid damage to the refrigerator. After freeze-drying each time, after the ice on the cold trap coil turns into water, clean it with a towel and freeze-drying. After turning on the "inflation valve" to inflate the cold trap, it must be slow to avoid damaging the vacuum gauge.
Maintenance of the instrument 1. The surface of the compressor heat sink should be kept clean, and it can be cleaned with a dry cloth or dry brush. 2. The rubber ring does not need to be oiled under normal circumstances, but it must be kept free of particulate impurities. 3. Keep the ambient temperature moderate, too high or too low will cause oil leakage. 4. Vacuum pump oil changes from light color to yellow, brown, brown or even black during use. The new oil should be replaced when it is brown. The scale of the oil should be ≤1 / 2. It needs to be changed when suspended matter is found in the oil window. oil. If the dirt in the oil separator above the pump exceeds 1/2, the oil needs to be drained.
Shanghai Haozhuang Instrument has an industry-recognized team of experts and first-class scientific and technical talents. Based on its profound understanding and mastery of scientific instrument technology, on the basis of independent research and development of core technology of scientific instruments, it is committed to creating an international first-class laboratory instrument brand Variety, and first-class quality, look forward to new and old customers to inquire!

It is new latest design  2300W Hair Dryer. it comes with hot and cool function and also comes with hi and low function . so it have dual switch control. that is not comes with other.in today's day and age,  it comes with good quality and low price. so all can afford it. From room occupying appliances and pocket-fitting devices, to meters and meters of cables, no home is stranger to any of these.

Hair Dryer 2300W

Hair Dryer 2300W,Fast Blow-Dryer,high-performance blow-dryer,Hair Dryer Diffusers and Blow Dryers

Ningbo Meirou Electric Appliance Co.,Ltd. , https://www.mrhairdryer.com